FAQ FAQ  Forum Search   Register Register  Login Login

Bolt 3 Configuration - In Process

Post Date: 2017-02-14

 Post Reply Post Reply
Author
  Topic Search Topic Search  Topic Options Topic Options
gka View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 14 Feb 2017
Online Status: Offline
Posts: 2
  Quote gka Quote  Post ReplyReply bullet Topic: Bolt 3 Configuration - In Process
    Posted: 14 Feb 2017 at 12:25pm
Hey guys!

I ordered a Bolt 3 two weeks ago on Friday, January 27!
It went through Stage 1 on January 30.
It went through Stage 1 on February 1 to Stage 2 and Stage 3.
It went through Stage 3 on February 10 to Stage 4 and Stage 5.

It's currently in Stage 5 as of Friday. That marks 10 business days from Stage 1, and today is the 12th business day.

Does anyone know how long Stage 5 usually takes? I was hoping it'd stay in the 10-15 business day range but it seems my computer has fallen behind schedule.



Here is the full configuration for anyone curious:
System Configuration:
Chassis Model: Special Deal Hot Seller - Pre-built Digital Storm Bolt 3
Exterior Finish: Bullet Grey Finish
Side Window: Edge to Edge Premium Acrylic
Processor: Intel Core i7-7700K 4.2 GHz (Codename Kaby Lake) (Unlocked CPU) (Quad Core)
Motherboard: ASUS Z170I PRO GAMING (Intel Z170 Chipset) (Mini-ITX) (Up to 1x PCI-E Device)
System Memory: 16GB DDR4 2666MHz Digital Storm Performance Series
Power Supply: 550W Lian-Li PE-550 (Supports up to GTX 1080)
Expansion Bay: - No Thanks
Optical Drive: DVD-R/RW/CD-R/RW (DVD Writer 8x / CD-Writer 8x) (Internal)
Storage Set 1: 1x SSD (500GB Samsung 850 EVO)
Storage Set 2: 1x Storage (2TB Seagate / Toshiba)
Storage Set 3: - No Thanks
RAID Config: - No Thanks
RAID Card: - No Thanks
Internet Access: High Speed Network Port (Supports High-Speed Cable / DSL / Network Connections)
Graphics Card(s): 1x GeForce GTX 1080 8GB (Performance Edition) (VR Ready)
Sound Card: Integrated Motherboard Audio
HPC Processor: - No Thanks
Extreme Cooling: Digital Storm HydroLux PRO (CPU Only)
HydroLux Tubing Style: Flexible Tubing (Requires HydroLux Liquid Cooling System)
HydroLux Fluid Color: White Fluid (Requires HydroLux Liquid Cooling System)
Cable Management: Exotic Cable Management - White - (Cable Combs with Custom Color Sleeved Extension Cables)
Chassis Fans: Standard Black 120mm Fans
Internal Lighting: Remote Controlled Internal + Front Panel RGB LED Lighting
Airflow Control: - No Thanks
Chassis Mods: - No Thanks
Noise Reduction: - No Thanks
LaserMark: - No Thanks
CPU Boost: Standard Intel Turbo Boost 2.0 Automatic Overclocking
Graphics Boost: - No Thanks, Please do not overclock my video card(s)
OS Boost: - No Thanks, Please do not tweak the services on the operating system
Windows OS: Microsoft Windows 10 Home (64-Bit Edition)
Recovery Tools: - No Thanks
Virus Protection: FREE: McAfee AntiVirus Plus (1 Year Service Activation Card) (Not Pre-installed) ($35 Value)
Office: - No Thanks
Game: - No Thanks
Display: - No Thanks
Surge Shield: - No Thanks
Speakers: - No Thanks
Keyboard: - No Thanks
Mouse: - No Thanks
Branded Gear: - No Thanks
Back to Top
bprat22 View Drop Down
DS ELITE
DS ELITE

DigitalStorm East -- (Unofficially!)
Email address used to purchase matched with forums account email.

Joined: 08 Jun 2011
Online Status: Offline
Posts: 20391
  Quote bprat22 Quote  Post ReplyReply bullet Posted: 14 Feb 2017 at 12:58pm
We on the forum can't give time lines on the various stages. There are variables like parts supply, how busy they are, how testing goes, etc that make it impossible.    Five people will give five different answers from what I've seen.    

They Estimate 15-20 business days to shipping and the operative word is , Estimated.   Some go quicker and some get held up.

I do understand the desire to get it asap, I would, but they are built on demand.

Hope it stays on schedule for you.




Back to Top
Alex View Drop Down
Admin Group
Admin Group

Digital Storm Supervisor


Joined: 04 Jun 2012
Online Status: Offline
Posts: 16314
  Quote Alex Quote  Post ReplyReply bullet Posted: 14 Feb 2017 at 1:12pm
Hang in there, the 20th business day is February 27th from the day we processed your order. Stage 5 usually takes the longest, it will be worth it in the end.

We will do our best to get it out ASAP.
Back to Top
gka View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 14 Feb 2017
Online Status: Offline
Posts: 2
  Quote gka Quote  Post ReplyReply bullet Posted: 14 Feb 2017 at 3:36pm
Originally posted by Alex

Hang in there, the 20th business day is February 27th from the day we processed your order. Stage 5 usually takes the longest, it will be worth it in the end.

We will do our best to get it out ASAP.

You guys must be good luck; it just moved to Stage 6! Thanks for the magic responses   
Back to Top
Alex View Drop Down
Admin Group
Admin Group

Digital Storm Supervisor


Joined: 04 Jun 2012
Online Status: Offline
Posts: 16314
  Quote Alex Quote  Post ReplyReply bullet Posted: 14 Feb 2017 at 3:45pm
Back to Top
 Post Reply Post Reply

Forum Jump Forum Permissions View Drop Down



This page was generated in 4.882813E-02 seconds.