Stages as given by emailsPost Date: 2015-01-14 |
Post Reply
|
| Author | |
michaeljhuman
Groupie
Joined: 09 Jan 2015 Online Status: Offline Posts: 297 |
Quote Reply
Topic: Stages as given by emailsPosted: 14 Jan 2015 at 12:35pm |
|
Is there a list, just curious as I found the explanations a bit contradictory like where Stage 2 says next step is phase 1 stress testing, but then the next email says Stage 3, phase 1 integration Unless they skip steps between those emails |
|
|
"The other day, I shot an elephant in my pajamas. What an elephant was doing in my pajamas, I will never know"
|
|
![]() |
|
Tidgxor
DS ELITE
The Kokopelli kid
Joined: 17 Sep 2010 Online Status: Offline Posts: 13000 |
Quote Reply
Posted: 14 Jan 2015 at 1:25pm |
|
Last I knew the full stages and their descriptions are:
Stage 1: (Payment Processed) Your order has been successfully processed. Our accounting department is now preparing your build sheet and passing this over to our inventory control department so we may allocate the components necessary for your order. Stage 2: (Inventory Assignment) A special component bin has been assigned for your order. We then locate components from our inventory and place them inside your component bin. If any components are out of stock, we are then waiting for them to be delivered to our storage center. Once all of the hardware is inside your component bin, it is then placed in queue for phase 1 stress-testing. Stage 3: (Phase 1 Stress Testing) Your order is now placed into one of our specialized test benches. The installation of the operating system, drivers and any applications that are specific to the system you ordered are completed here. Our Digital Storm Integration Engineer will also install any demos, benchmark utilities, and burn-in software necessary to correctly monitor your systems performance throughout our burn-in process. Afterwards, we perform a series of grueling tests that push the hardware components in your system to the very limit. This Stage is especially important because it is here where the system either excels or fails. If it does fail, our Digital Storm technicians will identify any problems and replace them before we ship your computer system. If the computer system still does not pass our tests, we will then re-build it with a new batch of components. Stage 4: (Engineering Lab) Your order has successfully passed our phase 1 stress testing, it has now progressed into our engineering lab. A specialized Digital Storm Assembly Engineer will carefully put together your order as if it was their own. They have a passion to build every system as if it was their show piece. Stage 5: (Phase 2 Stress Testing) Your order has been passed to our final phase 2 stress-testing team. They run a final batch of tests to verify the integrity and stability of your system. This allows us to ensure that every system we ship will be a rock solid machine for years to come. Stage 6: (Quality Assurance) Your system is undergoing a very detailed quality control analysis. A Digital Storm Quality Inspector is tasked with inspecting your machine for missing screws, loose cards, checking for special requests, verifying the configuration, and double checking our stress-test results. Our inspectors are trained with an eye for detail and ensure that every system leaves our facility with the art of perfection. Stage 7: (QA Check Passed) Your order has successfully passed our stringent quality assurance process. Everything from top to bottom on your purchase has been verified by an experienced Digital Storm technician. |
|
|
My Two Digital Storm Rigs: Mr. Bojangles (HAF-X, 2010) & Mrs. Bojingles (Bolt I, 2013).
|
|
![]() |
|
michaeljhuman
Groupie
Joined: 09 Jan 2015 Online Status: Offline Posts: 297 |
Quote Reply
Posted: 14 Jan 2015 at 1:55pm |
|
Thanks, very nice
|
|
|
"The other day, I shot an elephant in my pajamas. What an elephant was doing in my pajamas, I will never know"
|
|
![]() |
|
Tidgxor
DS ELITE
The Kokopelli kid
Joined: 17 Sep 2010 Online Status: Offline Posts: 13000 |
Quote Reply
Posted: 15 Jan 2015 at 12:38pm |
|
Happy to help!
|
|
|
My Two Digital Storm Rigs: Mr. Bojangles (HAF-X, 2010) & Mrs. Bojingles (Bolt I, 2013).
|
|
![]() |
|
Alex
Admin Group
Digital Storm Supervisor
Joined: 04 Jun 2012 Online Status: Offline Posts: 16314 |
Quote Reply
Posted: 15 Jan 2015 at 4:19pm |
|
Bingo!
|
|
![]() |
|
Post Reply
|
| Forum Jump | Forum Permissions ![]() You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You can vote in polls in this forum |