FAQ FAQ  Forum Search   Register Register  Login Login

Vanquish 7 Level 2 steps?

Post Date: 2018-02-19

 Post Reply Post Reply
Author
  Topic Search Topic Search  Topic Options Topic Options
CarlHitEmUp View Drop Down
Newbie
Newbie


Joined: 19 Feb 2018
Online Status: Offline
Posts: 1
  Quote CarlHitEmUp Quote  Post ReplyReply bullet Topic: Vanquish 7 Level 2 steps?
    Posted: 19 Feb 2018 at 10:32am
Hello! My name is Carlos, and I have a question when it comes to my order that I will hopefully do soon for the Vanquish 7 level 2.

My Question is, How long does it usually take DS to build it, test it, and then ship it since its not a Custom build?

System Configuration:
Chassis Model: Digital Storm VANQUISH 7 - Level 2
Exterior Finish: - Standard Factory Finish
Trim Accents: - Standard Factory Finish
Processor: AMD Ryzen 5 1600 (Turbo Up to 3.6 GHz) (6-Core) 3.2 GHz
Motherboard: ASUS / MSI (AMD B350M Chipset) (Up to 2x PCI-E Devices)
System Memory: 8GB DDR4 2400MHz Digital Storm Performance Series
Power Supply: 600W Corsair / EVGA (Supports up to an NVIDIA GTX 1080 Graphics Card)
Expansion Bay: - No Thanks
Optical Drive: - No Thanks
Storage Set 1: 1x SSD (240GB Digital Storm Performance Series)
Storage Set 2: 1x Storage (2TB Seagate / Toshiba)
Storage Set 3: - No Thanks
RAID Config: - No Thanks
RAID Card: - No Thanks
Internet Access: High Speed Network Port (Supports High-Speed Cable / DSL / Network Connections)
Graphics Card(s): 1x GeForce GTX 1060 6GB (VR Ready)
Sound Card: Integrated Motherboard Audio
HPC Processor: - No Thanks
Extreme Cooling: AMD Standard Factory Heat-sink and Fan
HydroLux Tubing Style: - Not Applicable, I do not have a custom HydroLux liquid cooling system selected
HydroLux Fluid Color: - Not Applicable, I do not have a custom HydroLux liquid cooling system selected
Cable Management: Premium Cable Management (Strategically Routed & Organized for Airflow)
Chassis Fans: Standard Factory Chassis Fans
Internal Lighting: Remote Controlled LED Lighting System (Multiple color options and lighting effects)
Airflow Control: - No Thanks
Chassis Mods: - No Thanks
Noise Reduction: - No Thanks
LaserMark: - No Thanks
CPU Boost: Stock Factory Turbo Boost Advanced Automatic Overclocking
Graphics Boost: - No Thanks, Please do not overclock my video card(s)
OS Boost: - No Thanks, Please do not tweak the services on the operating system
Operating System: Microsoft Windows 10 Home (64-Bit Edition)
Recovery Tools: Windows 10 Installation CD Only (Clean Install with No Drivers)
Virus Protection: Windows Defender Antivirus (Built-in to Windows 10)
Office: - No Thanks
Game: - No Thanks
Display: - No Thanks
Surge Shield: - No Thanks
Speakers: - No Thanks
Keyboard: CM Storm Devastator II Bundle (Blue LED Edition) (Gaming Keyboard & Gaming Mouse)
Mouse: - No Thanks
Branded Gear: - No Thanks
Priority Build: - No Thanks, Ship Within 10-15 Business Days After Order Is Successfully Processed
Warranty: Life-time Expert Care with 3 Year Limited Warranty (3 Year Labor & 1 Year Part Replacement)
Back to Top
bprat22 View Drop Down
DS ELITE
DS ELITE

DigitalStorm East -- (Unofficially!)
Email address used to purchase matched with forums account email.

Joined: 08 Jun 2011
Online Status: Offline
Posts: 20391
  Quote bprat22 Quote  Post ReplyReply bullet Posted: 19 Feb 2018 at 10:44am
The configurator states, 10-15 weeks days, so 2-3 weeks before it ships.   Could be sooner or not, depending on their workload, parts, etc.

Big%20Smile
Back to Top
Snaike View Drop Down
Moderator Group
Moderator Group

Just a dude trying to keep the spam away
Email address used to purchase matched with forums account email.

Joined: 23 Jan 2014
Online Status: Offline
Posts: 9459
  Quote Snaike Quote  Post ReplyReply bullet Posted: 20 Feb 2018 at 2:18am
I would think you should figure one month from order to arrival. Just to be realistic. If it shows up before then, consider that a bonus.   
Back to Top
 Post Reply Post Reply

Forum Jump Forum Permissions View Drop Down



This page was generated in 4.003906E-02 seconds.