FAQ FAQ  Forum Search   Register Register  Login Login

How long did your order stage in each stage?

Post Date: 2008-06-01

 Post Reply Post Reply
Page  123 4>
Author
  Topic Search Topic Search  Topic Options Topic Options
Maestro View Drop Down
Groupie
Groupie

Email address used to purchase matched with forums account email.

Joined: 27 May 2008
Online Status: Offline
Posts: 56
  Quote Maestro Quote  Post ReplyReply bullet Topic: How long did your order stage in each stage?
    Posted: 01 Jun 2008 at 2:46pm
I was not sure where to put this, because it is not an issue and it is not a review. Move it if you wish :).

I was just hoping people could all post their experiences with the "Stages" system of DSO. I haven't gotten my order yet, but I'm not complaining or anything, just a little curious. :) Here is mine as of now..

Enter Stage 1 - May 28th
Enter Stage 2 - May 29th
Enter Stage 3 - Pending
Back to Top
SunfighterLC View Drop Down
DS Veteran
DS Veteran


Joined: 18 Feb 2008
Online Status: Offline
Posts: 1527
  Quote SunfighterLC Quote  Post ReplyReply bullet Posted: 01 Jun 2008 at 3:31pm
Ordered May 11th. (sunday)
 
Stage 1: May 12th
Stage 2: May 14th
Stage 3: May 21st
Stage 4: May 21st
Stage 5: May 29th
Stage T: May 30th
 
Shipping date: N/A -- estimated 4-8 business days from May 30th =(
E8500@ 4.03Ghz
XFX 790i Ultra
1000W Corsair HX
2 280 GTX EVGA FTW
4GB OCZ Reaper 1800Mhz
250-80-300GB VR HD
Logitech Z-2300 2.1 Speakers
Asus Xonar 7.1
Hanns-G HG 281D 28" HDMI Monitor
Back to Top
kclemens View Drop Down
Groupie
Groupie

Email address used to purchase matched with forums account email.

Joined: 19 May 2008
Online Status: Offline
Posts: 147
  Quote kclemens Quote  Post ReplyReply bullet Posted: 01 Jun 2008 at 3:51pm
Sunfighter it will be interesting to see who gets our rig first.
Estimated Shipment Date: 3-5 business days (Mon-Fri) from 5/30/2008


Edited by kclemens - 01 Jun 2008 at 3:52pm
Back to Top
SunfighterLC View Drop Down
DS Veteran
DS Veteran


Joined: 18 Feb 2008
Online Status: Offline
Posts: 1527
  Quote SunfighterLC Quote  Post ReplyReply bullet Posted: 01 Jun 2008 at 4:11pm
Depends on whats wrong with mine and if they have a weekend team look after stage T computers or that team is just for RMAs. Im in no real hurry, im more curious to find out what is wrong with it. I might called them about it Monday, im considering since it seems like its gonna be there a while...i might order some extra stuff for it =P or see if i can complain enough that they will throw in something stupid for free..haha..Then again i probably shouldnt of mentioned that...haha!
 
Its more annoying then anything because before it hit Stage T i was thinking to myself...my first computer i ever had was great, the second was quirky as hell, and now my current one has been great, I see a pattern forming... this one is gonna be quirky as hell! Heck its already quirky and its not even finished yet!


Edited by SunfighterLC - 01 Jun 2008 at 4:25pm
E8500@ 4.03Ghz
XFX 790i Ultra
1000W Corsair HX
2 280 GTX EVGA FTW
4GB OCZ Reaper 1800Mhz
250-80-300GB VR HD
Logitech Z-2300 2.1 Speakers
Asus Xonar 7.1
Hanns-G HG 281D 28" HDMI Monitor
Back to Top
Wallyguitar View Drop Down
Senior Member
Senior Member


Joined: 21 May 2008
Online Status: Offline
Posts: 100
  Quote Wallyguitar Quote  Post ReplyReply bullet Posted: 01 Jun 2008 at 4:46pm
Ordered: May 21st
Stage 1: May 22nd
Stage 2: May 23rd
Stage 3: ???
 
According to an email from Kelly there was a delay in parts but it was put in line to be build on the 30th. 
 
Starting to think I'll be back in England (June 28th) before my rig gets there (APO shipping takes forever).

Click pic to see config
Back to Top
Awk View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 09 May 2008
Online Status: Offline
Posts: 15
  Quote Awk Quote  Post ReplyReply bullet Posted: 01 Jun 2008 at 11:43pm
Ordered: May 15
Stage 1: May 15
Stage 2: May 15
Stage 3: May 23
Stage 4: May 23
Stage 5: May 23
Stage 6: June 2
Stage 7: June 6
Shipped: June 6
Estimated Arrival Date: 6/11/2008
 
Seems like mine's getting worked on (or just updated) in spurts. The estimated ship date's passed a few times by a couple days, which is not a huge deal.
 
Updated:
16 days from start to shipment


Edited by Awk - 07 Jun 2008 at 3:09am
Back to Top
Hanakaze View Drop Down
Newbie
Newbie


Joined: 16 May 2008
Online Status: Offline
Posts: 3
  Quote Hanakaze Quote  Post ReplyReply bullet Posted: 02 Jun 2008 at 4:35am
Order placed: May 1
Stage 1: May 2
Stage 2: May 7
Stage 3: May 14
Stage 4: May 14
Stage 5: May 15
Stage 6: May 30

Shipping on June 2---
Back to Top
Kliebor2 View Drop Down
Senior Member
Senior Member


Joined: 22 May 2008
Online Status: Offline
Posts: 659
  Quote Kliebor2 Quote  Post ReplyReply bullet Posted: 02 Jun 2008 at 6:28am
Mine has been chugging along darn well so far :)

Order May 22
Stage 1 - May 22
Stage 2 - May 23
Stage 3 - Never saw it
Stage 4 - May 30 - Delayed due to lack of 9800GTX cards
Estimated Ship 3-5 business days from May 30

Wahoo :)
Digital Storm 950Si - Q9450 Quad Core @ 3 Ghz
Dual PNY OC2 GTX 560Ti
8 Gigabytes DDR2/800
2 Western Digital 500 GB SATAII 7200 RPM HD
Back to Top
Aich Shaoden View Drop Down
Senior Member
Senior Member


Joined: 22 May 2008
Online Status: Offline
Posts: 128
  Quote Aich Shaoden Quote  Post ReplyReply bullet Posted: 02 Jun 2008 at 9:04am
Order May 25
Stage 1: May 27
Stage 2: May 29
Stage 3: Waiting for Stage 2 completion...
 
I ordered 3 - Day Air Shipping
 
 
Wow a month for your build Hanakaze lol? Hopefully mine dont take that long. :(


Edited by Aich Shaoden - 02 Jun 2008 at 9:06am
Ordered: May 25 | Shipped: Jun 20 | Business Day: 19
850Si 1000W Corsair
Q9450 OC - 790i
4GB Corsair DDR3 1333MHz + Fan Upgrade
250GB WD(7200) Air Stage 3
eVGA 9800GTX SLI
Back to Top
Hanakaze View Drop Down
Newbie
Newbie


Joined: 16 May 2008
Online Status: Offline
Posts: 3
  Quote Hanakaze Quote  Post ReplyReply bullet Posted: 02 Jun 2008 at 12:16pm
They ran into a snag with my motherboard in Stage 5, had to replace it.  I'm glad its going to arrive soon. Thumbs%20Up
Back to Top
Giao View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 29 May 2008
Online Status: Offline
Posts: 16
  Quote Giao Quote  Post ReplyReply bullet Posted: 02 Jun 2008 at 2:26pm

I laugh at myself about how accustomed I have become to "instant satisfaction" for stuff Ibuy. I mean I buy online for digital delivery so often that when something has to ship I get peeved! 

Reading all the order times makes the pit of my stomach do the little "ugh".  heheh I want the new system so badly that it makes you wish you could deal with rigs the same way you deal with software:  Download now for purchases made!  LOL
 
I'm not complaining! I am all for quality, as I would be more dissapointed getting it quick and having it bomb on me all the time.  I love what DSO is doing :-)  Ill be back for other system purchases I am sure.
 
The ultimate Key Performance Indicator:  High quality and Instant gratification :-)   Wouldnt that be great!
 
Ordered May 28
Stage 1: May 29
Stage 2 (current): May 30
 
DSO 850Si
1000W Silverstone
Q9450 OC
4GB Dominator Corsair
790i motherboard
2x Nvidia 9800GTX 512MB
Frostbite CPU Cooled only.
Back to Top
SunfighterLC View Drop Down
DS Veteran
DS Veteran


Joined: 18 Feb 2008
Online Status: Offline
Posts: 1527
  Quote SunfighterLC Quote  Post ReplyReply bullet Posted: 02 Jun 2008 at 4:19pm

Found out the problem with my system, apparently the video card isnt working, son of a ! haha.

E8500@ 4.03Ghz
XFX 790i Ultra
1000W Corsair HX
2 280 GTX EVGA FTW
4GB OCZ Reaper 1800Mhz
250-80-300GB VR HD
Logitech Z-2300 2.1 Speakers
Asus Xonar 7.1
Hanns-G HG 281D 28" HDMI Monitor
Back to Top
kclemens View Drop Down
Groupie
Groupie

Email address used to purchase matched with forums account email.

Joined: 19 May 2008
Online Status: Offline
Posts: 147
  Quote kclemens Quote  Post ReplyReply bullet Posted: 02 Jun 2008 at 4:33pm
Damn, that sucks Sunfighter.  I hope my rig gets shipped out this week.  Its on Stage 5 now.
Back to Top
SunfighterLC View Drop Down
DS Veteran
DS Veteran


Joined: 18 Feb 2008
Online Status: Offline
Posts: 1527
  Quote SunfighterLC Quote  Post ReplyReply bullet Posted: 02 Jun 2008 at 4:39pm

yea if it takes too long like another week or so ill just say like..alright screw the 98GX2 and throw a 88Ultra in there and give me a deathadder mouse...that would equal out the price again....but then again..i dont really want a mouse..lol but i couldnt find anything else to fill in that 60 dollar gap...

E8500@ 4.03Ghz
XFX 790i Ultra
1000W Corsair HX
2 280 GTX EVGA FTW
4GB OCZ Reaper 1800Mhz
250-80-300GB VR HD
Logitech Z-2300 2.1 Speakers
Asus Xonar 7.1
Hanns-G HG 281D 28" HDMI Monitor
Back to Top
kclemens View Drop Down
Groupie
Groupie

Email address used to purchase matched with forums account email.

Joined: 19 May 2008
Online Status: Offline
Posts: 147
  Quote kclemens Quote  Post ReplyReply bullet Posted: 02 Jun 2008 at 4:49pm
Hmm...buy age of conan and get ur 8800. LOL

Edited by kclemens - 02 Jun 2008 at 4:50pm
Back to Top
SunfighterLC View Drop Down
DS Veteran
DS Veteran


Joined: 18 Feb 2008
Online Status: Offline
Posts: 1527
  Quote SunfighterLC Quote  Post ReplyReply bullet Posted: 02 Jun 2008 at 5:18pm
I dont see why everybody likes that game. lol. Maybe its just not my kind of game..but i dont have much intrest in it.
E8500@ 4.03Ghz
XFX 790i Ultra
1000W Corsair HX
2 280 GTX EVGA FTW
4GB OCZ Reaper 1800Mhz
250-80-300GB VR HD
Logitech Z-2300 2.1 Speakers
Asus Xonar 7.1
Hanns-G HG 281D 28" HDMI Monitor
Back to Top
Giao View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 29 May 2008
Online Status: Offline
Posts: 16
  Quote Giao Quote  Post ReplyReply bullet Posted: 02 Jun 2008 at 5:43pm
GO DSO!  You guys are awesome... Update today:
Ordered May 28
Stage 1: May 29
Stage 2 (current): May 30
Stage 3
Stage 4: June 2  w/ Estimated ship date 3-5 business days.
 
Originally posted by Giao

 
...SNIP.....
 
Ordered May 28
Stage 1: May 29
Stage 2 (current): May 30
 
DSO 850Si
1000W Silverstone
Q9450 OC
4GB Dominator Corsair
790i motherboard
2x Nvidia 9800GTX 512MB
Frostbite CPU Cooled only.
 
Back to Top
Maestro View Drop Down
Groupie
Groupie

Email address used to purchase matched with forums account email.

Joined: 27 May 2008
Online Status: Offline
Posts: 56
  Quote Maestro Quote  Post ReplyReply bullet Posted: 02 Jun 2008 at 5:48pm
Originally posted by Giao

GO DSO!  You guys are awesome... Update today:
Ordered May 28
Stage 1: May 29
Stage 2 (current): May 30
Stage 3
Stage 4: June 2  w/ Estimated ship date 3-5 business days.
 
Originally posted by Giao

 
...SNIP.....
 
Ordered May 28
Stage 1: May 29
Stage 2 (current): May 30
 
DSO 850Si
1000W Silverstone
Q9450 OC
4GB Dominator Corsair
790i motherboard
2x Nvidia 9800GTX 512MB
Frostbite CPU Cooled only.
 


It seems we ordered about the same time.. I hope they can pull off this speed with mine! :P
Back to Top
Tripwire View Drop Down
Newbie
Newbie


Joined: 14 May 2008
Online Status: Offline
Posts: 36
  Quote Tripwire Quote  Post ReplyReply bullet Posted: 02 Jun 2008 at 6:27pm
Ordered May 18th (Sunday)
 
Stage 1: May 19th
Stage 2: May 22nd (Still waiting...)
 
They had to substitute a 950 case instead of the 850, but no other updates.  That is all...Dead
Back to Top
Jeff57 View Drop Down
Newbie
Newbie


Joined: 20 May 2008
Online Status: Offline
Posts: 4
  Quote Jeff57 Quote  Post ReplyReply bullet Posted: 02 Jun 2008 at 6:45pm
Ordered May 12
Stage 2 May 14
Stage 3 ?
Stage 4 May 21Cry
Waiting on Bad MotherBoardCry

Back to Top
e.fruman View Drop Down
Groupie
Groupie


Joined: 14 May 2008
Online Status: Offline
Posts: 140
  Quote e.fruman Quote  Post ReplyReply bullet Posted: 02 Jun 2008 at 9:19pm
quality over speed people!
Back to Top
SunfighterLC View Drop Down
DS Veteran
DS Veteran


Joined: 18 Feb 2008
Online Status: Offline
Posts: 1527
  Quote SunfighterLC Quote  Post ReplyReply bullet Posted: 02 Jun 2008 at 10:03pm

There needs to be a limit though ya know. Im generally not too concerned because i assumed when I ordered it would probably take 3 weeks or more. But anything over a month + is unacceptable minus the computer having technical problems, mine does so i dont mind if its gonna go over a month really. But you still get the ants in the pants ya know? It gets rough near the end of waiting for something for a month after you slaped several grand for it.

 
My computer is getting very close to the time where i might just ask them to hold it till the GTX 280 comes out and put one of those in there! lol. I doubt theyd do that special request though.
E8500@ 4.03Ghz
XFX 790i Ultra
1000W Corsair HX
2 280 GTX EVGA FTW
4GB OCZ Reaper 1800Mhz
250-80-300GB VR HD
Logitech Z-2300 2.1 Speakers
Asus Xonar 7.1
Hanns-G HG 281D 28" HDMI Monitor
Back to Top
kclemens View Drop Down
Groupie
Groupie

Email address used to purchase matched with forums account email.

Joined: 19 May 2008
Online Status: Offline
Posts: 147
  Quote kclemens Quote  Post ReplyReply bullet Posted: 03 Jun 2008 at 12:22am
When they advertise 5-10 days, a month is too long.  If you cannot hit your own advertised ship time, do not put it on the front page of your homepage.  Nothing against the company, but that is false advertising.
Back to Top
Wallyguitar View Drop Down
Senior Member
Senior Member


Joined: 21 May 2008
Online Status: Offline
Posts: 100
  Quote Wallyguitar Quote  Post ReplyReply bullet Posted: 03 Jun 2008 at 2:36pm
Just hit stage 4.  Shipping out 3-5 days from the 2nd. Thumbs%20Up  Good luck to who ever is building my rig!

Click pic to see config
Back to Top
BRITinUS View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 15 May 2008
Online Status: Offline
Posts: 10
  Quote BRITinUS Quote  Post ReplyReply bullet Posted: 03 Jun 2008 at 2:37pm
Ordered May 14th
 
Stage 1: May 14th
Stage 2: May 14th
Stage 3: May ????
Stage 4: May 27th
Stage 5: May 27th
Stage 6:
 
Estimated shipment date: 2-3 business days (Mon-Fri) from 5/27/2008
 
Waiting patiently in anticipation....Wink
Back to Top
Maestro View Drop Down
Groupie
Groupie

Email address used to purchase matched with forums account email.

Joined: 27 May 2008
Online Status: Offline
Posts: 56
  Quote Maestro Quote  Post ReplyReply bullet Posted: 03 Jun 2008 at 3:58pm
It seems DSO averages about 20 days to a month for order arrivals. That sucks. Oh well :P.
Back to Top
Wallyguitar View Drop Down
Senior Member
Senior Member


Joined: 21 May 2008
Online Status: Offline
Posts: 100
  Quote Wallyguitar Quote  Post ReplyReply bullet Posted: 04 Jun 2008 at 9:39am
Just hit Stage 5!!
 
*crosses fingers*

Click pic to see config
Back to Top
BRITinUS View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 15 May 2008
Online Status: Offline
Posts: 10
  Quote BRITinUS Quote  Post ReplyReply bullet Posted: 04 Jun 2008 at 1:58pm
Ordered May 14th
 
Stage 1: May 14th
Stage 2: May 14th
Stage 3: May ????
Stage 4: May 27th
Stage 5: May 27th Estimated shipment date: 2-3 business days (Mon-Fri) from 5/27/2008
Stage 6: June 4th  Estimated shipment date: 0-1 business days (Mon-Fri) from 6/4/2008
 
Almost there...Tongue
Back to Top
SunfighterLC View Drop Down
DS Veteran
DS Veteran


Joined: 18 Feb 2008
Online Status: Offline
Posts: 1527
  Quote SunfighterLC Quote  Post ReplyReply bullet Posted: 04 Jun 2008 at 2:06pm
They seem to miss stage 3 a lot lol.
E8500@ 4.03Ghz
XFX 790i Ultra
1000W Corsair HX
2 280 GTX EVGA FTW
4GB OCZ Reaper 1800Mhz
250-80-300GB VR HD
Logitech Z-2300 2.1 Speakers
Asus Xonar 7.1
Hanns-G HG 281D 28" HDMI Monitor
Back to Top
Tripwire View Drop Down
Newbie
Newbie


Joined: 14 May 2008
Online Status: Offline
Posts: 36
  Quote Tripwire Quote  Post ReplyReply bullet Posted: 04 Jun 2008 at 2:09pm
I think Stage 3 is just an urban legend.  I'm sure my build will jump from Stage 2 directly to 5 any minute now...any minute now...
950Si | 1000W C HX | Q9450 OC | 4GB C DDR2 1066MHz | 150GB WD(10K)+250GB WD(7200) | Air Cool 3 | 2x SLI 8800GTX OC | SB X-Fi FPS

Order-5/18
S1-5/20
2-5/22
3-6/9
4-6/9
5-6/9
6-6/16
7-6/17
Back to Top
SunfighterLC View Drop Down
DS Veteran
DS Veteran


Joined: 18 Feb 2008
Online Status: Offline
Posts: 1527
  Quote SunfighterLC Quote  Post ReplyReply bullet Posted: 04 Jun 2008 at 2:10pm
nah..stage T is coming for you!!!
E8500@ 4.03Ghz
XFX 790i Ultra
1000W Corsair HX
2 280 GTX EVGA FTW
4GB OCZ Reaper 1800Mhz
250-80-300GB VR HD
Logitech Z-2300 2.1 Speakers
Asus Xonar 7.1
Hanns-G HG 281D 28" HDMI Monitor
Back to Top
Tripwire View Drop Down
Newbie
Newbie


Joined: 14 May 2008
Online Status: Offline
Posts: 36
  Quote Tripwire Quote  Post ReplyReply bullet Posted: 04 Jun 2008 at 2:11pm
Aaaahhhhh!!! Censored
950Si | 1000W C HX | Q9450 OC | 4GB C DDR2 1066MHz | 150GB WD(10K)+250GB WD(7200) | Air Cool 3 | 2x SLI 8800GTX OC | SB X-Fi FPS

Order-5/18
S1-5/20
2-5/22
3-6/9
4-6/9
5-6/9
6-6/16
7-6/17
Back to Top
Giao View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 29 May 2008
Online Status: Offline
Posts: 16
  Quote Giao Quote  Post ReplyReply bullet Posted: 04 Jun 2008 at 2:27pm
Originally posted by SunfighterLC

nah..stage T is coming for you!!!
 
OK I am missing something what the [expletive removed] is Stage T?
Back to Top
Kliebor2 View Drop Down
Senior Member
Senior Member


Joined: 22 May 2008
Online Status: Offline
Posts: 659
  Quote Kliebor2 Quote  Post ReplyReply bullet Posted: 04 Jun 2008 at 2:28pm
It means your computer was a bad boy/girl and had a component that raised a red flag to one of the DSO Techs/QA guys
Digital Storm 950Si - Q9450 Quad Core @ 3 Ghz
Dual PNY OC2 GTX 560Ti
8 Gigabytes DDR2/800
2 Western Digital 500 GB SATAII 7200 RPM HD
Back to Top
Giao View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 29 May 2008
Online Status: Offline
Posts: 16
  Quote Giao Quote  Post ReplyReply bullet Posted: 04 Jun 2008 at 2:33pm
Lol, ok so does it stand for "Toast" ?  What other acronyms come to mind for T ....
 
Tanked
Trouble
...
 
Here is hoping to no Stage T on my stage 5 order.  I will take a moment to toss a prayer out to the god of good system builds.
Back to Top
 Post Reply Post Reply Page  123 4>

Forum Jump Forum Permissions View Drop Down



This page was generated in 0.0859375 seconds.