    Posted: 21 Mar 2021 at 3:09am
Hi guys! I only ordered a month ago (feb 22- stage 1). Today at March 21 it’s only been 20 business days so trust me I’m not at all expecting my PC for at least a few weeks more lol.

I ordered 3080 and 9 5900x, which I know when I ordered said “backordered until March”. I originally expected a sometime in April ship date (in my mind I thought: CPU unavailable till March, so 20-25 business days after production starts sometime in March when they get the CPU = around April ship time.).

Anywho, I emailed a couple days ago asking for an estimated ship time but they said I couldn’t get one till I get into stage 2. Which, I understand Digital Storm probably don’t want to give any right now in case further delays occur. But now I’m worried because last I checked the 5900x says “backordered till April” in the parts configure screen. I wouldn’t want to switch the CPU since I’m planning on workstation tasks either. (I have someone flying in in May as well that needs a system for music production while here, so if it’s not going to be here in May I’ll just need to ask him to pack his own system- Mac thankfully so should be easy.)

Super long story short:
Anyone else here that ordered a 5900x; do you remember your stage dates? I don’t mind much waiting but I’m just trying to get a sense for what I’m looking at time wise. Thanks!
Back to Top
BadWolf View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 14 Feb 2021
Online Status: Offline
Posts: 14
  Quote BadWolf Quote  Post ReplyReply bullet Posted: 21 Mar 2021 at 6:58pm
Hi there I ordered the same CPU and the same GPU here are my stages so far :)

STAGE 1 12/30
STAGE 2 3/4
STAGE 3 3/18

Not sure if it's the best point of reference as I ordered during a pretty hectic time but hope it helps in some way.

Edited by BadWolf - 21 Mar 2021 at 6:59pm
BW
Back to Top
ealderson View Drop Down
Groupie
Groupie

Email address used to purchase matched with forums account email.

Joined: 12 Feb 2021
Online Status: Offline
Posts: 142
  Quote ealderson Quote  Post ReplyReply bullet Posted: 21 Mar 2021 at 7:07pm
I think it is tough to compare stage times since most of us have such different builds. Granted the CPU/GPU might be the same but the rest of it mixes in a bunch more variables. That said, I had a 5950x and a 3800 and below were my stage times. I wouldn't let the "backordered <month>" thing throw you too much. When I ordered mine it said "backordered February" and like a day or two after I ordered mine they changed the label to "backordered March". I got my system much faster than I expected so hopefully you will too.


Order - 1/23
Stage 1 - 1/25
Stage 2 - 2/24
Stage 3 - 2/25
Stage 4 - 3/5
Stage 5 - 3/8
Stage 6 - 3/9
Stage 7 - 3/9
Shipped - 3/9
Back to Top
LaneBerry View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 10 Mar 2021
Online Status: Offline
Posts: 8
  Quote LaneBerry Quote  Post ReplyReply bullet Posted: 22 Mar 2021 at 1:39am
Originally posted by BadWolf

Hi there I ordered the same CPU and the same GPU here are my stages so far :)

STAGE 1 12/30
STAGE 2 3/4
STAGE 3 3/18

Not sure if it's the best point of reference as I ordered during a pretty hectic time but hope it helps in some way.


Thank you!! I can deal with 40ish business days in stage 1. I think a mid-April stage 2 will be a first couple weeks of May ship date so I can somewhat plan ahead considering that. Thanks!!!
Back to Top
Mijanur View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 16 Dec 2020
Online Status: Offline
Posts: 9
  Quote Mijanur Quote  Post ReplyReply bullet Posted: 23 Mar 2021 at 3:21pm
I ordered the same system in November 18 and it wasn’t until March that the states finally started moving, it went to stage 2 at December 30, and stayed at stage 2 until March. Now it’s finally at stage 7
Back to Top
LaneBerry View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 10 Mar 2021
Online Status: Offline
Posts: 8
  Quote LaneBerry Quote  Post ReplyReply bullet Posted: 24 Mar 2021 at 2:28am
Originally posted by Mijanur

I ordered the same system in November 18 and it wasn’t until March that the states finally started moving, it went to stage 2 at December 30, and stayed at stage 2 until March. Now it’s finally at stage 7


Oh my god! ... I might have underestimated how long it stays in stage 2 then... do they have the 5900x cpu when it goes into stage 2? Or can stage 2 start when they have a collection of other parts and are still waiting? I’m confused why stage 2 would be that intense!! Great job waiting through that though that’s a nightmare
Back to Top
Cretae View Drop Down
DS Veteran
DS Veteran

Email address used to purchase matched with forums account email.

Joined: 22 Mar 2010
Online Status: Offline
Posts: 7331
  Quote Cretae Quote  Post ReplyReply bullet Posted: 24 Mar 2021 at 4:46am
My understanding is stage 2 is CPU assignment. The build can get held up from there for awaiting other parts.
Back to Top
BBV2 View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 17 Mar 2021
Online Status: Offline
Posts: 4
  Quote BBV2 Quote  Post ReplyReply bullet Posted: 24 Mar 2021 at 9:20am
From what I've seen expect around 6 months total for your system to be completed. I am going on 3 months at this point and I'm still at Stage 3. I called them upfront and asked if there were going to be significant delays before ordering because I expected some delays, the guy of course told me there shouldn't be any large delays. A total lie. I'll just continue to wait of course, no other choice, but there is no way I will ever buy from DS again nor recommend them to anybody.
Back to Top
LaneBerry View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 10 Mar 2021
Online Status: Offline
Posts: 8
  Quote LaneBerry Quote  Post ReplyReply bullet Posted: 24 Mar 2021 at 9:35am
So from what I’m understanding... there may be further delays in stage 2 unrelated to the 5900 since by stage 2 the CPU should already be allocated for the build?

...That’s a little worrying since you would think the other parts would have been found by the time a 5900 comes in. Do they not allocate any parts until the CPU is in even for builds with backordered CPU’s?

I’m not sure if I’ll be in California (where I’m having it shipped to) or not in late July-August so if it comes to that I’ll have to ask a family member to wait for a package & sign for me . I hope it doesn’t come to that though lol. Crossing my fingers it isn’t THAT bad... :,). I’m only 23 business days in though so no worries yet.
Back to Top
LaneBerry View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 10 Mar 2021
Online Status: Offline
Posts: 8
  Quote LaneBerry Quote  Post ReplyReply bullet Posted: 04 Apr 2021 at 6:08am
Update: I got an estimated ship date of end of May! I’m still in stage one but because I’ll be flying out of country I wanted to make sure it didn’t land on when I leave so I emailed again couple times. Bit sad that it’s an ETA of 70ish business days but what can you do. If it arrives then I’ll have a few weeks to test it and I don’t have that worry about shipping damage I can’t report for a month till I see it.