FAQ FAQ  Forum Search   Register Register  Login Login

Average Length of Build for x15E

Post Date: 2012-07-23

 Post Reply Post Reply
Author
  Topic Search Topic Search  Topic Options Topic Options
Tamar View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 23 Jul 2012
Online Status: Offline
Posts: 29
  Quote Tamar Quote  Post ReplyReply bullet Topic: Average Length of Build for x15E
    Posted: 23 Jul 2012 at 11:21pm
Hello, as you can see from my post count I am a newbie to the forums. I don't remember how I came to be acquainted with Digital Storm but I must say I am impressed with the positive reviews and the A+ ranking with the BBB.

Anyways, to the point of this post. I was just wondering what was the average build time for a level 1 x15E? I saw that it said the estimated ship date is 10-15 business days. In the email the order was acknowledged on the 13th (A friday so I hope that doesn't jinx anything) and said that it should ship by the 28th. But that is 15 days including weekends, so I'm a little confused. Sorry for the question, I'm just extremely anxious to get my new computer Big%20Smile
Back to Top
 Post Reply Post Reply

Forum Jump Forum Permissions View Drop Down



This page was generated in 4.101563E-02 seconds.