day 1 to shipping questionPost Date: 2008-06-29 |
Post Reply
|
Author | |
Jezus
Newbie Joined: 29 Jun 2008 Online Status: Offline Posts: 1 |
Quote Reply
Topic: day 1 to shipping question Posted: 29 Jun 2008 at 3:12pm |
how long does it usually take to ship, I was looking into overnight shipping, knowing that it wont be here tomorrow obviously. how many days do you think it would take to throw this build together:
Chassis: Antec 900 Exterior Finish: - Standard Factory Finish Interior Finish: - Standard Factory Finish Power Supply: 1000W Corsair HX (Dual/Triple/Quad SLI Compatible) Processor: Intel Core 2 Duo E8500 3.16GHz (1333MHz Front Side Bus) (6MB Cache) Motherboard: nVidia 790i Ultra Core 2 Quad (nForce 790i Ultra SLI) (DDR3 Only) System Memory: 4GB DDR3 Corsair at 1600MHz Dominator DHX (High-Performance) Card Reader: 1.44MB Floppy (Black Edition) Hard Drive 1: 300GB Western Digital VelociRaptor (10K RPM) (16MB Cache) (Extreme Speed) Hard Drive 2: - No Thanks Raid Option: - No Thanks Hard Drive 3: - No Thanks Optical Drive 1: DVD-ROM/CD-ROM (DVD Reader 16x / CD Reader 40x) Optical Drive 2: DVD±R/RW/CD-R/RW (DVD Writer 20x / CD-Writer 48x) Internet Access: High Speed Network Port (Supports High-Speed Cable / DSL / Network Connections) Video Card: NVIDIA GeForce GTX 280 1GB TV Tuner: - No Thanks Sound Card: Razer Barracuda AC-1 (Recommended) Extreme Cooling: Air Cooled Stage 3 WindTunnel (Copper Heatpipe Heatsink & Zalman Case Fans) Internal Lighting: Blizzard Internal Lighting (Blue Edition) (Cold Cathode Tubes) Modifications: - No Thanks Boost Processor: Yes, Overclock the processor as much as possible with complete stability Boost Video Card: Yes, Overclock the video card(s) as much as possible with complete stability Boost Memory: Yes, Overclock memory timings (Includes Memory Fan Kit Installed) Tweak Windows: Yes, Disable and tweak all of the non-crucial services on the operating system Windows OS: Microsoft Windows Vista Home Premium Restore Kit: Digital Storm Specialized Recovery System (DVD Image Based) Protection: - No Thanks Office: - No Thanks Benchmarking: - No Thanks Install/Test Game: - No Thanks LCD Display: - No Thanks Surge Shield: - No Thanks Speakers: - No Thanks Keyboard: - No Thanks Mouse: Razer DeathAdder Gaming Mouse (High-Speed Gaming Grade) External Storage: - No Thanks Warranty: 3 Year Platinum Care Extended Parts & Labor Warranty |
|
Future of DSO.
|
|
Nickdapimp
Senior Member Joined: 24 Jun 2008 Online Status: Offline Posts: 324 |
Quote Reply Posted: 29 Jun 2008 at 3:54pm |
it all depends, if a part failures then they gotta retest it and maybe replace it which takes MORE time. Maybe 1-2 week? Call them probably every 5 days and check up on em
|
|
SunfighterLC
DS Veteran Joined: 18 Feb 2008 Online Status: Offline Posts: 1527 |
Quote Reply Posted: 29 Jun 2008 at 5:11pm |
Thats all fairly new stuff. Plus all that overclocking.
All i got to say is my inital computer was a lot less then what you were getting, and it took 18 business days before it shipped. Keep in mind there was 4.5 days in stage T (technical problems) and memorial day (i didnt count that as a business day though).
Mine didnt have overclocking, i could do that myself thereby saving hundreds. Your overclocking of everything will increase your chances for Stage T as overclocking can lead to instability, plus you have more items on your computer as well, which the more stuff you add the greater chance something will conflict or fail their testing.
|
|
E8500@ 4.03Ghz
XFX 790i Ultra 1000W Corsair HX 2 280 GTX EVGA FTW 4GB OCZ Reaper 1800Mhz 250-80-300GB VR HD Logitech Z-2300 2.1 Speakers Asus Xonar 7.1 Hanns-G HG 281D 28" HDMI Monitor |
|
Post Reply |
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You can vote in polls in this forum |