FAQ FAQ  Forum Search   Register Register  Login Login

Description of Stages

Post Date: 2018-03-07

 Post Reply Post Reply
Author
  Topic Search Topic Search  Topic Options Topic Options
BF3Addict View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 10 Nov 2011
Online Status: Offline
Posts: 49
  Quote BF3Addict Quote  Post ReplyReply bullet Topic: Description of Stages
    Posted: 07 Mar 2018 at 7:27pm
I've been looking through the DS website and I can't find the description of the various stages of build. I'm pretty sure I found it once before, but I'm unable to find it again.

Can anybody point me in the right direction?
Back to Top
Batman34 View Drop Down
Groupie
Groupie

Email address used to purchase matched with forums account email.

Joined: 15 Aug 2016
Online Status: Offline
Posts: 366
  Quote Batman34 Quote  Post ReplyReply bullet Posted: 07 Mar 2018 at 8:43pm
Hi BF3. Here's a description of the six stages when purchasing from Digital Storm. I'm assuming nothing has changed since my purchase last summer (I received this info from Digital Storm in an email when I made my purchase):

"Stage 1: (Payment Processed)
Your order has been successfully processed. Our accounting department is now preparing your build sheet and passing this over to our inventory control department so we may allocate the components necessary for your order.

Stage 2: (Inventory Assignment)
A special component bin has been assigned for your order. We then locate components from our inventory and place them inside your component bin. If any components are out of stock, we are then waiting for them to be delivered to our storage center. Once all of the hardware is inside your component bin, it is then placed in queue for phase 1 stress-testing.

Stage 3: (Phase 1 Stress Testing)
Your order is now placed into one of our specialized test benches. The installation of the operating system, drivers and any applications that are specific to the system you ordered are completed here. Our Digital Storm Integration Engineer will also install any demos, benchmark utilities, and burn-in software necessary to correctly monitor your systems performance throughout our burn-in process. Afterwards, we perform a series of grueling tests that push the hardware components in your system to the very limit. This Stage is especially important because it is here where the system either excels or fails. If it does fail, our Digital Storm technicians will identify any problems and replace them before we ship your computer system. If the computer system still does not pass our tests, we will then re-build it with a new batch of components.

Stage 4: (Engineering Lab)
Your order has successfully passed our phase 1 stress testing, it has now progressed into our engineering lab. A specialized Digital Storm Assembly Engineer will carefully put together your order as if it was their own. They have a passion to build every system as if it was their show piece.

Stage 5: (Phase 2 Stress Testing)
Your order has been passed to our final phase 2 stress-testing team. They run a final batch of tests to verify the integrity and stability of your system. This allows us to ensure that every system we ship will be a rock solid machine for years to come.

Stage 6: (Quality Assurance)
Your system is undergoing a very detailed quality control analysis. A Digital Storm Quality Inspector is tasked with inspecting your machine for missing screws, loose cards, checking for special requests, verifying the configuration, and double checking our stress-test results. Our inspectors are trained with an eye for detail and ensure that every system leaves our facility with the art of perfection."
"It's not who I am underneath, but what I do that defines me." - Batman Begins
Back to Top
hoserator View Drop Down
DS Veteran
DS Veteran

We don't need no stinking "Avatars" !
Email address used to purchase matched with forums account email.

Joined: 08 Oct 2014
Online Status: Offline
Posts: 7966
  Quote hoserator Quote  Post ReplyReply bullet Posted: 08 Mar 2018 at 2:31am
Missing Stage 7 - Shipping -Hahaha
Back to Top
bprat22 View Drop Down
DS ELITE
DS ELITE

DigitalStorm East -- (Unofficially!)
Email address used to purchase matched with forums account email.

Joined: 08 Jun 2011
Online Status: Offline
Posts: 20391
  Quote bprat22 Quote  Post ReplyReply bullet Posted: 08 Mar 2018 at 3:01am
They used to send the stages description with ordering confirmation.   Maybe not anymore?

Back to Top
Tidgxor View Drop Down
DS ELITE
DS ELITE

The Kokopelli kid
Email address used to purchase matched with forums account email.

Joined: 17 Sep 2010
Online Status: Offline
Posts: 13000
  Quote Tidgxor Quote  Post ReplyReply bullet Posted: 08 Mar 2018 at 3:24am
Originally posted by bprat22

They used to send the stages description with ordering confirmation.   Maybe not anymore?



Maybe I am wholly fabricating this in my old spritely young age, but I feel like Alex commented once about how they were sort of putting less emphasis on the stages these days due to all the confusion they can potentially cause since each machine might move through them at different rates, etc.

But again, that could be entirely in my mind so take that for what it is, a Tidgxor Post©.

LOL
Back to Top
bprat22 View Drop Down
DS ELITE
DS ELITE

DigitalStorm East -- (Unofficially!)
Email address used to purchase matched with forums account email.

Joined: 08 Jun 2011
Online Status: Offline
Posts: 20391
  Quote bprat22 Quote  Post ReplyReply bullet Posted: 08 Mar 2018 at 3:44am
Not fabricating.      Now that you mention it,   I remember the same discussion a year or two ago, probably longer.     Some of us thought it was a good idea, the stages causing so much anxiety.   Plus the time it takes is what it is.   




Edited by bprat22 - 08 Mar 2018 at 3:44am
Back to Top
Tidgxor View Drop Down
DS ELITE
DS ELITE

The Kokopelli kid
Email address used to purchase matched with forums account email.

Joined: 17 Sep 2010
Online Status: Offline
Posts: 13000
  Quote Tidgxor Quote  Post ReplyReply bullet Posted: 08 Mar 2018 at 3:47am
Good to know I'm not crazy.

Us young folk have to stick together. Hahaha
Back to Top
Cretae View Drop Down
DS Veteran
DS Veteran

Email address used to purchase matched with forums account email.

Joined: 22 Mar 2010
Online Status: Offline
Posts: 7331
  Quote Cretae Quote  Post ReplyReply bullet Posted: 08 Mar 2018 at 5:02am
Is this why I'm a SENIOR member?


Back to Top
Alex View Drop Down
Admin Group
Admin Group

Digital Storm Supervisor


Joined: 04 Jun 2012
Online Status: Offline
Posts: 16314
  Quote Alex Quote  Post ReplyReply bullet Posted: 08 Mar 2018 at 2:26pm
The VANQUISH builds may not go through the stage process as we build them in batches. We recommend looking at the estimated ship date from the day your order is processed which currently is 10-15 business days.
Back to Top
 Post Reply Post Reply

Forum Jump Forum Permissions View Drop Down



This page was generated in 5.224609E-02 seconds.