Description of StagesPost Date: 2018-03-07 |
Post Reply
|
| Author | |
BF3Addict
Newbie
Joined: 10 Nov 2011 Online Status: Offline Posts: 49 |
Quote Reply
Topic: Description of StagesPosted: 07 Mar 2018 at 7:27pm |
|
I've been looking through the DS website and I can't find the description of the various stages of build. I'm pretty sure I found it once before, but I'm unable to find it again.
Can anybody point me in the right direction? |
|
![]() |
|
Batman34
Groupie
Joined: 15 Aug 2016 Online Status: Offline Posts: 366 |
Quote Reply
Posted: 07 Mar 2018 at 8:43pm |
|
Hi BF3. Here's a description of the six stages when purchasing from Digital Storm. I'm assuming nothing has changed since my purchase last summer (I received this info from Digital Storm in an email when I made my purchase):
"Stage 1: (Payment Processed) Your order has been successfully processed. Our accounting department is now preparing your build sheet and passing this over to our inventory control department so we may allocate the components necessary for your order. Stage 2: (Inventory Assignment) A special component bin has been assigned for your order. We then locate components from our inventory and place them inside your component bin. If any components are out of stock, we are then waiting for them to be delivered to our storage center. Once all of the hardware is inside your component bin, it is then placed in queue for phase 1 stress-testing. Stage 3: (Phase 1 Stress Testing) Your order is now placed into one of our specialized test benches. The installation of the operating system, drivers and any applications that are specific to the system you ordered are completed here. Our Digital Storm Integration Engineer will also install any demos, benchmark utilities, and burn-in software necessary to correctly monitor your systems performance throughout our burn-in process. Afterwards, we perform a series of grueling tests that push the hardware components in your system to the very limit. This Stage is especially important because it is here where the system either excels or fails. If it does fail, our Digital Storm technicians will identify any problems and replace them before we ship your computer system. If the computer system still does not pass our tests, we will then re-build it with a new batch of components. Stage 4: (Engineering Lab) Your order has successfully passed our phase 1 stress testing, it has now progressed into our engineering lab. A specialized Digital Storm Assembly Engineer will carefully put together your order as if it was their own. They have a passion to build every system as if it was their show piece. Stage 5: (Phase 2 Stress Testing) Your order has been passed to our final phase 2 stress-testing team. They run a final batch of tests to verify the integrity and stability of your system. This allows us to ensure that every system we ship will be a rock solid machine for years to come. Stage 6: (Quality Assurance) Your system is undergoing a very detailed quality control analysis. A Digital Storm Quality Inspector is tasked with inspecting your machine for missing screws, loose cards, checking for special requests, verifying the configuration, and double checking our stress-test results. Our inspectors are trained with an eye for detail and ensure that every system leaves our facility with the art of perfection." |
|
|
"It's not who I am underneath, but what I do that defines me." - Batman Begins
|
|
![]() |
|
hoserator
DS Veteran
We don't need no stinking "Avatars" !
Joined: 08 Oct 2014 Online Status: Offline Posts: 7966 |
Quote Reply
Posted: 08 Mar 2018 at 2:31am |
|
Missing Stage 7 - Shipping -
|
|
![]() |
|
bprat22
DS ELITE
DigitalStorm East -- (Unofficially!)
Joined: 08 Jun 2011 Online Status: Offline Posts: 20391 |
Quote Reply
Posted: 08 Mar 2018 at 3:01am |
|
They used to send the stages description with ordering confirmation. Maybe not anymore?
|
|
![]() |
|
Tidgxor
DS ELITE
The Kokopelli kid
Joined: 17 Sep 2010 Online Status: Offline Posts: 13000 |
Quote Reply
Posted: 08 Mar 2018 at 3:24am |
Maybe I am wholly fabricating this in my But again, that could be entirely in my mind so take that for what it is, a Tidgxor Post©. ![]() |
|
|
My Two Digital Storm Rigs: Mr. Bojangles (HAF-X, 2010) & Mrs. Bojingles (Bolt I, 2013).
|
|
![]() |
|
bprat22
DS ELITE
DigitalStorm East -- (Unofficially!)
Joined: 08 Jun 2011 Online Status: Offline Posts: 20391 |
Quote Reply
Posted: 08 Mar 2018 at 3:44am |
|
Not fabricating.
Now that you mention it, I remember the same discussion a year or two ago, probably longer. Some of us thought it was a good idea, the stages causing so much anxiety. Plus the time it takes is what it is.
Edited by bprat22 - 08 Mar 2018 at 3:44am |
|
![]() |
|
Tidgxor
DS ELITE
The Kokopelli kid
Joined: 17 Sep 2010 Online Status: Offline Posts: 13000 |
Quote Reply
Posted: 08 Mar 2018 at 3:47am |
|
Good to know I'm not crazy.
Us young folk have to stick together. ![]() |
|
|
My Two Digital Storm Rigs: Mr. Bojangles (HAF-X, 2010) & Mrs. Bojingles (Bolt I, 2013).
|
|
![]() |
|
Cretae
DS Veteran
Joined: 22 Mar 2010 Online Status: Offline Posts: 7331 |
Quote Reply
Posted: 08 Mar 2018 at 5:02am |
|
Is this why I'm a SENIOR member?
|
|
![]() |
|
Alex
Admin Group
Digital Storm Supervisor
Joined: 04 Jun 2012 Online Status: Offline Posts: 16314 |
Quote Reply
Posted: 08 Mar 2018 at 2:26pm |
|
The VANQUISH builds may not go through the stage process as we build them in batches. We recommend looking at the estimated ship date from the day your order is processed which currently is 10-15 business days.
|
|
![]() |
|
Post Reply
|
| Forum Jump | Forum Permissions ![]() You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You can vote in polls in this forum |