How many phasesPost Date: 2018-11-24 |
Post Reply
|
| Author | ||
Jusbonez419
Newbie
Joined: 14 Nov 2018 Online Status: Offline Posts: 6 |
Quote Reply
Topic: How many phasesPosted: 24 Nov 2018 at 11:23pm |
|
|
What's up everyone, how many phases do I have to go through before i receive my System?
|
||
![]() |
||
Tidgxor
DS ELITE
The Kokopelli kid
Joined: 17 Sep 2010 Online Status: Offline Posts: 13000 |
Quote Reply
Posted: 25 Nov 2018 at 12:09am |
|
|
I don't know if this is still accurate as it's older now, but here is what the stages were when I purchased: Stage 1: (Payment Processed) Your order has been successfully processed. Our accounting department is now preparing your build sheet and passing this over to our inventory control department so we may allocate the components necessary for your order. Stage 2: (Inventory Assignment) A special component bin has been assigned for your order. We then locate components from our inventory and place them inside your component bin. If any components are out of stock, we are then waiting for them to be delivered to our storage center. Once all of the hardware is inside your component bin, it is then placed in queue for phase 1 stress-testing. Stage 3: (Phase 1 Stress Testing) Your order is now placed into one of our specialized test benches. The installation of the operating system, drivers and any applications that are specific to the system you ordered are completed here. Our Digital Storm Integration Engineer will also install any demos, benchmark utilities, and burn-in software necessary to correctly monitor your systems performance throughout our burn-in process. Afterwards, we perform a series of grueling tests that push the hardware components in your system to the very limit. This Stage is especially important because it is here where the system either excels or fails. If it does fail, our Digital Storm technicians will identify any problems and replace them before we ship your computer system. If the computer system still does not pass our tests, we will then re-build it with a new batch of components. Stage 4: (Engineering Lab) Your order has successfully passed our phase 1 stress testing, it has now progressed into our engineering lab. A specialized Digital Storm Assembly Engineer will carefully put together your order as if it was their own. They have a passion to build every system as if it was their show piece. Stage 5: (Phase 2 Stress Testing) Your order has been passed to our final phase 2 stress-testing team. They run a final batch of tests to verify the integrity and stability of your system. This allows us to ensure that every system we ship will be a rock solid machine for years to come. Stage 6: (Quality Assurance) Your system is undergoing a very detailed quality control analysis. A Digital Storm Quality Inspector is tasked with inspecting your machine for missing screws, loose cards, checking for special requests, verifying the configuration, and double checking our stress-test results. Our inspectors are trained with an eye for detail and ensure that every system leaves our facility with the art of perfection. Stage 7: (QA Check Passed) Your order has successfully passed our stringent quality assurance process. Everything from top to bottom on your purchase has been verified by an experienced Digital Storm technician. After that comes shipping.
|
||
|
My Two Digital Storm Rigs: Mr. Bojangles (HAF-X, 2010) & Mrs. Bojingles (Bolt I, 2013).
|
||
![]() |
||
Jusbonez419
Newbie
Joined: 14 Nov 2018 Online Status: Offline Posts: 6 |
Quote Reply
Posted: 25 Nov 2018 at 12:17am |
|
|
Awesome thanks I'm currently in stage 6 I ordered it the October 28th, it was accepted the 29th, and still have not got it yet...
|
||
![]() |
||
Jusbonez419
Newbie
Joined: 14 Nov 2018 Online Status: Offline Posts: 6 |
Quote Reply
Posted: 25 Nov 2018 at 12:18am |
|
|
Do they not work on the weekends? Do you know?!
|
||
![]() |
||
spaces
Newbie
Joined: 04 Nov 2018 Online Status: Offline Posts: 39 |
Quote Reply
Posted: 25 Nov 2018 at 6:39am |
|
They only work buisness days |
||
![]() |
||
Jusbonez419
Newbie
Joined: 14 Nov 2018 Online Status: Offline Posts: 6 |
Quote Reply
Posted: 25 Nov 2018 at 6:42am |
|
------- Alright thanks |
||
![]() |
||
bprat22
DS ELITE
DigitalStorm East -- (Unofficially!)
Joined: 08 Jun 2011 Online Status: Offline Posts: 20391 |
Quote Reply
Posted: 25 Nov 2018 at 7:23am |
|
|
During peak times they do assemble and test on weekends. Good luck.
![]() |
||
![]() |
||
Snaike
Moderator Group
Just a dude trying to keep the spam away
Joined: 23 Jan 2014 Online Status: Offline Posts: 9462 |
Quote Reply
Posted: 26 Nov 2018 at 7:31am |
|
|
"Tis the season"... I'll wager they ~are~ working weekends and after hours but not officially. Only "Business Days" are counted toward deadlines (i.e. Monday - Friday).
|
||
![]() |
||
Jusbonez419
Newbie
Joined: 14 Nov 2018 Online Status: Offline Posts: 6 |
Quote Reply
Posted: 27 Nov 2018 at 4:28pm |
|
------- Ah ok, just didn't know what the deal was hell hopefully I get it before Christmas lol |
||
![]() |
||
Jusbonez419
Newbie
Joined: 14 Nov 2018 Online Status: Offline Posts: 6 |
Quote Reply
Posted: 27 Nov 2018 at 4:29pm |
|
|
But thank you everyone, much appreciated!!
What all games do ya'll play?? |
||
![]() |
||
Snaike
Moderator Group
Just a dude trying to keep the spam away
Joined: 23 Jan 2014 Online Status: Offline Posts: 9462 |
Quote Reply
Posted: 27 Nov 2018 at 9:46pm |
|
|
Personally, I rotate between Shadow of War, Fallout 4, Skyrim and Elite:Dangerous while I wait for the next ~~big~~ thing. I knew it wasn't going to be FO 76 and I'm hoping against hope that RDR2 makes a pc port soon.
|
||
![]() |
||
Post Reply
|
| Forum Jump | Forum Permissions ![]() You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |