FAQ FAQ  Forum Search   Register Register  Login Login

Nvidia's 40nm to come in March 09

Post Date: 2008-10-30

 Post Reply Post Reply
Author
  Topic Search Topic Search  Topic Options Topic Options
DST4ME View Drop Down
DS ELITE
DS ELITE

Email address used to purchase matched with forums account email.

Joined: 14 Apr 2008
Online Status: Offline
Posts: 36758
  Quote DST4ME Quote  Post ReplyReply bullet Topic: Nvidia's 40nm to come in March 09
    Posted: 30 Oct 2008 at 2:07pm
Nvidia's 40nm to come in March 09

The new chip


If all goes well, Nvidia will have its new architecture 40nm chip ready for launch in March. We don’t know if this is a mainstream, low end or high end GPU, but at least one of these chips will be ready in March.


Of course, this is the best-case scenario and if something goes wrong, the schedule will have to be pushed back, but let’s be optimistic for a moment and hope for Nvidia’s sake that everything will go smooth this time.

Nvidia has hoped to have its 40nm chips earlier but due to some delays caused by TSMC this will have to wait at least until March. After Q2 2009 there should be even more chips from Nvidia and ATI in 40nm as they both plan to make this transition roughly at the same time.

Nvidia is likely to get to 40nm first, as ATI might wait to see what Nvidia has up its sleeve as it currently has the dominance with its 55nm but it should follow shortly after Nvidia, or roughly at the same time.

Back to Top
gamerk2 View Drop Down
Groupie
Groupie

Email address used to purchase matched with forums account email.

Joined: 28 May 2008
Online Status: Offline
Posts: 198
  Quote gamerk2 Quote  Post ReplyReply bullet Posted: 03 Nov 2008 at 1:03pm

I'm holding out until the first wave of DX11 cards are out, as my GX2 still crushes most anything i use.  We'll have an idea then who's back in front.

Back to Top
 Post Reply Post Reply

Forum Jump Forum Permissions View Drop Down



This page was generated in 3.515625E-02 seconds.