FAQ FAQ  Forum Search   Register Register  Login Login

Possible to change order at Stage 1?

Post Date: 2008-01-05

 Post Reply Post Reply
Author
  Topic Search Topic Search  Topic Options Topic Options
Venture View Drop Down
Groupie
Groupie

Email address used to purchase matched with forums account email.

Joined: 31 Dec 2007
Online Status: Offline
Posts: 107
  Quote Venture Quote  Post ReplyReply bullet Topic: Possible to change order at Stage 1?
    Posted: 05 Jan 2008 at 9:23am
Is it possible to change an order at Stage 1, and if so, how?  I want to upgrade Hard Drive 1, if possible.  Do I contact the sales email address, or some other address?

Thanks!
Back to Top
EdH63 View Drop Down
DS Veteran
DS Veteran


Joined: 01 Sep 2007
Online Status: Offline
Posts: 1826
  Quote EdH63 Quote  Post ReplyReply bullet Posted: 05 Jan 2008 at 9:25am
I think there is a number to call that routes you to India for order changes.  If you get a little man by the name of  Achmed, you're screwed!

JK dude.   
Back to Top
CougarX6 View Drop Down
Groupie
Groupie

Email address used to purchase matched with forums account email.

Joined: 06 Dec 2007
Online Status: Offline
Posts: 154
  Quote CougarX6 Quote  Post ReplyReply bullet Posted: 05 Jan 2008 at 10:00am

You should call them rather than emailing about any changes.  Although I've seen posted here recently that any change you make to your configuration could delay your order by 3-5 additional days.

Back to Top
pgs8113 View Drop Down
Senior Member
Senior Member


Joined: 26 Oct 2007
Online Status: Offline
Posts: 147
  Quote pgs8113 Quote  Post ReplyReply bullet Posted: 05 Jan 2008 at 3:44pm
I changed the processor mid-way into the order and it didn't seem to delay the order.  Switching from air cooling to liquid cooling would delay, but small changes like upgrading the video card or adding more ram, etc.. shouldn't delay it, there should be no reason for a delay. 
QX6850 Extreme 3.33 Ghz (OC)
nvidia 680i Core 2 Quad(A1)
2Gb Corsair Dominator 1066 Mhz
1x150 Gb Raptor (10k)
1x320 Gb WD
8800 Ultra 768 Mb
Back to Top
Dog Lover View Drop Down
Senior Member
Senior Member

Email address used to purchase matched with forums account email.

Joined: 17 Nov 2007
Online Status: Offline
Posts: 653
  Quote Dog Lover Quote  Post ReplyReply bullet Posted: 05 Jan 2008 at 5:58pm
You CAN make changes and they just charge you the price of the upgraded part.
 
Believe me.... due to heat issues, after it was all built, I had to add Thermoelectric Cooling and then later a bigger case.  That alone was two two more tear downs and rebuilds.  And then they found the mother board was no good.  Rebuild number three, that I knew of!
 
Call them.  They love to help you upgrade with no upsell fees for changing.  Anyway, that was my experience from a month or so ago.
Extreme Case
850 Watt Thermaltake
Qx6850 3.0 Ghz (stock speed)
780i Motherboard
4 G, 1066 RAM
2X SLI GTX 260, 896
Sound Blaster X-Fi XtremeGamer
Thermoelectric Liquid Chilled
Windows 7,64b
Back to Top
Clinton View Drop Down
Groupie
Groupie

Email address used to purchase matched with forums account email.

Joined: 08 Sep 2007
Online Status: Offline
Posts: 298
  Quote Clinton Quote  Post ReplyReply bullet Posted: 05 Jan 2008 at 6:46pm
Ya it only took about 2 minutes for them to upgrade my graphics card when I called, no extra delays or anything.
Back to Top
Venture View Drop Down
Groupie
Groupie

Email address used to purchase matched with forums account email.

Joined: 31 Dec 2007
Online Status: Offline
Posts: 107
  Quote Venture Quote  Post ReplyReply bullet Posted: 05 Jan 2008 at 8:38pm
Sweet, thanks for the replies.  I'll give them a call on Monday.  It just entered Stage 1 late on Friday, so hopefully it won't delay anything.
Back to Top
 Post Reply Post Reply

Forum Jump Forum Permissions View Drop Down



This page was generated in 0.0625 seconds.