pulled the triggerPost Date: 2010-06-24 |
Post Reply
|
| Author | |
Liq
Groupie
Joined: 19 Jun 2010 Online Status: Offline Posts: 112 |
Quote Reply
Topic: pulled the triggerPosted: 24 Jun 2010 at 7:47am |
|
Chassis Model: Special Deal Hot Seller - Cooler Master HAF X
Exterior Finish: - Standard Factory Finish Trim Accents: - Standard Factory Finish Processor: Intel Core i7 930 2.8GHz (Quad Core) Motherboard: EVGA X58 LE Edition SLI (Intel X58 Chipset) (Supports SLI or CrossFire) System Memory: 6GB DDR3 1600MHz Digital Storm Certified Performance Series (Highly Recommended) (Hand Tested) Power Supply: 750W Corsair TX (Dual SLI Compatible) Expansion Bay: - No Thanks Hard Drive Set 1: Operating System: 1x (80GB Solid State (By: Intel) (Extreme Performance) (Model: X25-M MLC Edition) Set 1 Raid Options: - No Thanks Hard Drive Set 2: Multimedia\Data: 1x (500GB Western Digital (16MB Cache) (7200 RPM) (SATA) Hard Drive Set 3: Backup\Misc.: - No Thanks Optical Drive 1: DVD-R/RW/CD-R/RW (DVD Writer 24x / CD-Writer 48x) Optical Drive 2: - No Thanks Internet Access: High Speed Network Port (Supports High-Speed Cable / DSL / Network Connections) Video Card: 1x ATI Radeon HD 5870 1GB Add-on Card: - No Thanks Sound Card: Integrated Motherboard Audio Extreme Cooling: AIR: Stage 1: Noctua Dual 120mm Fans High Performance Cooler (Compatible With ONLY i7 Processors) H20 Tube Color:- Not Applicable, I do not have a FrostChill or Sub-Zero LCS Cooling System Selected Chassis Airflow: Standard Factory Chassis Fans Internal Lighting: - No Thanks Enhancements: - No Thanks Chassis Mods: - No Thanks Noise Reduction: - No Thanks Boost Processor: FREE: Stage 1: Overclock the processor between 3.3GHz to 3.9GHz (Cooling Upgrade Recommended) Boost Video Card: - No Thanks, Please do not overclock my video card(s) Boost Memory: - No Thanks, Please do not overclock my memory Boost OS: - No Thanks, Please do not tweak the services on the operating system Windows OS: Microsoft Windows 7 Home Premium (64-Bit Edition) Restore Kit: Digital Storm Specialized Recovery System (DVD Image Based) Virus Protection: - No Thanks Office: - No Thanks Benchmarking: - No Thanks Install/Test Game: FREE: Hot-selling game with a NVIDIA GeForce GTS 250 or above graphics card Display: - No Thanks Surge Shield: - No Thanks Speakers: - No Thanks Keyboard: - No Thanks Mouse: - No Thanks External Storage: - No Thanks Exclusive T-Shirt: FREE: Digital Storm T-Shirt - Black (Medium) Priority Build: - No Thanks, Ship Within 5-15 Business Days After Order Is Successfully Processed Warranty: 3 Year Limited Warranty with Life-Time Customer Support (3 Year Labor & 1 Year Parts) I placed the order yesterday afternoon CST. How long does it typically take for my credit card to get charged and the process to begin? Does my confirmation number become active after the order has been processed? I did call my credit card provider yesterday to make sure they allow the transaction. |
|
![]() |
|
Dragoonseal
DS Veteran
Joined: 03 Apr 2009 Online Status: Offline Posts: 2247 |
Quote Reply
Posted: 24 Jun 2010 at 8:33am |
I had ordered mine over a weekend and before even noon PST on the Monday following I got a call about an issue with my config (this is before any of us knew the Noctua NH-D14 doesn't fit on the EVGA X58 3X board) and once it was quickly worked out the order was updated, approved and card was charged within a very short time after that. Once your order gets approved and they start the process you'll get an order number, which is like a small 5 digit number, and thats what you'll use to access the site with to get the current status of the order. But they also email you any time there are any changes or updates with the order so you'll never really need to check on it on the site. EDIT: Nice config, by the way. Edited by Dragoonseal - 24 Jun 2010 at 8:40am |
|
|
Lilim
Intel Core i7 920 @4.2GHz HAF 932 - Dual SLI Nvidia GTX 480s 3x Intel X25-M G2 (80GB) SSD RAID0 |
|
![]() |
|
Dalthius
Newbie
Joined: 28 May 2010 Online Status: Offline Posts: 65 |
Quote Reply
Posted: 24 Jun 2010 at 8:41am |
|
Liq,
It's been really smooth for me. I ordered on Monday, they called me that day to fix a credit card issue...silly me gave them the wrong card #. Anyway, it got charged almost immediately after. Yesterday (Wednesday) the computer as assembled and entered final testing (stage 5). It's moving quite rapidly. Ordering over a weekend or on a Monday appears to be a good idea.
With luck, my computer might ship tomorrow, which would be....awesome...
Let me know what you think about that HAF-X! I was stuck between that and the Assassin, but ended up having to go with the 922 due to limited room on my desk. Edited by Dalthius - 24 Jun 2010 at 8:46am |
|
![]() |
|
Liq
Groupie
Joined: 19 Jun 2010 Online Status: Offline Posts: 112 |
Quote Reply
Posted: 24 Jun 2010 at 4:44pm |
|
thanks for the help guys! I checked my email just now, and I'm at stage 3 so far for today. I'll be sure to post some pics as soon as it gets here.
|
|
![]() |
|
Post Reply
|
| Forum Jump | Forum Permissions ![]() You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You can vote in polls in this forum |