FAQ FAQ  Forum Search   Register Register  Login Login

Stuck Stage 1

Post Date: 2021-01-07

 Post Reply Post Reply
Author
  Topic Search Topic Search  Topic Options Topic Options
SyyCoR6 View Drop Down
Newbie
Newbie


Joined: 07 Jan 2021
Online Status: Offline
Posts: 2
  Quote SyyCoR6 Quote  Post ReplyReply bullet Topic: Stuck Stage 1
    Posted: 07 Jan 2021 at 9:07am
I have been stuck in stage 1 for about 10 days now. Any updates on my PC? Did not think it would take this long going with digital storm.
Anacleti
Back to Top
SyyCoR6 View Drop Down
Newbie
Newbie


Joined: 07 Jan 2021
Online Status: Offline
Posts: 2
  Quote SyyCoR6 Quote  Post ReplyReply bullet Posted: 07 Jan 2021 at 9:47am
Chassis Model: Digital Storm Velox
Exterior Finish: - Standard Factory Finish
Trim Accents: - Standard Factory Finish
Processor: Intel Core i9-10920X (12-Core) (Boost Up to 4.6 GHz)
Motherboard: MSI X299 PRO (Intel X299 Chipset) (Up to 4x PCI-E Devices)
System Memory: 32GB DDR4 3200MHz Digital Storm Performance Series
Power Supply: 850W Digital Storm Performance Series (Modular) (80 Plus Gold)
Expansion Bay: - No Thanks
Optical Drive: - No Thanks
Storage Set 1: 1x SSD M.2 (500GB Digital Storm M.2 Performance Series)
Storage Set 2: 1x Storage (2TB Seagate / Toshiba / Hitachi)
Storage Set 3: - No Thanks
RAID Config: - No Thanks
RAID Card: - No Thanks
Internet Access: High Speed Network Port (Supports High-Speed Cable / DSL / Network Connections)
Graphics Card(s): 1x GeForce RTX 3060 Ti 8GB (Performance Edition) (VR Ready)
Sound Card: Integrated Motherboard Audio
Add On Card: - No Thanks
Extreme Cooling: H20: Stage 2: Digital Storm Vortex Liquid CPU Cooler (Dual Fan) (Fully Sealed + No Maintenance)
HydroLux Tubing Style: - Not Applicable, I do not have a custom HydroLux liquid cooling system selected
HydroLux Fluid Color: - Not Applicable, I do not have a custom HydroLux liquid cooling system selected
Cable Management: Premium Cable Management (Strategically Routed & Organized for Airflow)
Chassis Fans: Standard Factory Chassis Fans
Internal Lighting: - No Thanks
Airflow Control: - No Thanks
Chassis Mods: - No Thanks
Noise Reduction: - No Thanks
LaserMark: - No Thanks
CPU Boost: Stage 1: Overclock CPU - Up to 4.5GHz via Intel Turbo Boost Max Technology 3.0
Graphics: Yes, Overclock the video card(s) as much as possible with complete stability
OS Boost: - No Thanks, Please do not tweak the services on the operating system
Operating System: Microsoft Windows 10 Home (64-Bit Edition)
Recovery Tools: USB Drive - Windows 10 Installation (Format and Clean Install)
Virus Protection: Windows Defender Antivirus (Built-in to Windows 10)
Office: - No Thanks
Mouse Pad: - No Thanks
Display: - No Thanks
Surge Shield: - No Thanks
Speakers: - No Thanks
Keyboard: - No Thanks
Mouse: - No Thanks
Branded Gear: - No Thanks
Priority Build: - No Thanks, Ship Within 20-25 Business Days After Order Is Successfully Processed
Warranty: Life-time Expert Care with 3 Year Limited Warranty (3 Year Labor & 1 Year Part Replacement)

Is anything being delayed in my build?
Anacleti
Back to Top
Steven3232 View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 09 Jan 2021
Online Status: Offline
Posts: 12
  Quote Steven3232 Quote  Post ReplyReply bullet Posted: 09 Jan 2021 at 12:36am
If it makes you feel better I've been at stage 1 since since November 27th. I would guess your 3060ti will be a delay but can't confirm that.
Back to Top
Cretae View Drop Down
DS Veteran
DS Veteran

Email address used to purchase matched with forums account email.

Joined: 22 Mar 2010
Online Status: Offline
Posts: 7331
  Quote Cretae Quote  Post ReplyReply bullet Posted: 09 Jan 2021 at 4:29am
You might want to look up what an NVMe SSD can do versus the DS SATA M.2 part you picked. Just 5-10 times faster is all. If you think that might change your entire experience with this box, you'd be right.

10 days standing in the build line is nothing, BTW. right after the holidays. That's maybe 6 BUSINESS days, and I wouldn't expect your build to move off Stage 1 until about 20 BUSINESS days have passed. You count that not from when your order was placed, but when it was approved.
Back to Top
bprat22 View Drop Down
DS ELITE
DS ELITE

DigitalStorm East -- (Unofficially!)
Email address used to purchase matched with forums account email.

Joined: 08 Jun 2011
Online Status: Offline
Posts: 20391
  Quote bprat22 Quote  Post ReplyReply bullet Posted: 09 Jan 2021 at 5:34am
Been checking in on occasion and seeing all the delays in getting a new rig.  Tough times all around, between pandemic, supply shortages, busy as hell, etc.

My 2 DS rigs, the newest about 2 years old, the oldest back in 2012, both humming along just fine.  DS might have supply and communication issues, but they do know how to build a gaming rig.   Could be their popularity has them a bit overwhelmed at times.  Not making excuses for them, just thinking out loud.


Back to Top
Dango2 View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 31 Dec 2020
Online Status: Offline
Posts: 12
  Quote Dango2 Quote  Post ReplyReply bullet Posted: 12 Jan 2021 at 11:10am
I’m with you. I’ve been in stage one going on 4 weeks. And it’s not a supply issue from what I can gather. I was told once you get out of stage 1 things will move quickly. Hoping to see a change by end of this week.
Back to Top
Bamareb28 View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 18 Dec 2020
Online Status: Offline
Posts: 61
  Quote Bamareb28 Quote  Post ReplyReply bullet Posted: 12 Jan 2021 at 11:18am
Same boat....27 days stuck in stage 1. I was told by Alex that they were waiting on a 3080 card. Hoping its built and shipped by end of January. I will say that patience is key, this being my second DS order. They make great machines that have so far lasted me 6 years. BUT for the money we paid (4K PLUS) the wait times can get to our heads lol.





Lumos
i7-10900k
32gb ram
RTX 3080
500 gb NVME SSD
2 Tb 860 EVO
Back to Top
Dango2 View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 31 Dec 2020
Online Status: Offline
Posts: 12
  Quote Dango2 Quote  Post ReplyReply bullet Posted: 12 Jan 2021 at 12:12pm
Originally posted by Bamareb28

Same boat....27 days stuck in stage 1. I was told by Alex that they were waiting on a 3080 card. Hoping its built and shipped by end of January. I will say that patience is key, this being my second DS order. They make great machines that have so far lasted me 6 years. BUT for the money we paid (4K PLUS) the wait times can get to our heads lol.


This is interesting. A read a thread last week saying they had plenty of 3080 GPU’s
I’ll have to double check that




Lumos
i7-10900k
32gb ram
RTX 3080
500 gb NVME SSD
2 Tb 860 EVO
Back to Top
Dango2 View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 31 Dec 2020
Online Status: Offline
Posts: 12
  Quote Dango2 Quote  Post ReplyReply bullet Posted: 12 Jan 2021 at 12:30pm
Originally posted by Dango2

Originally posted by Bamareb28

Same boat....27 days stuck in stage 1. I was told by Alex that they were waiting on a 3080 card. Hoping its built and shipped by end of January. I will say that patience is key, this being my second DS order. They make great machines that have so far lasted me 6 years. BUT for the money we paid (4K PLUS) the wait times can get to our heads lol.


This is interesting. A read a thread last week saying they had plenty of 3080 GPU’s
I’ll have to double check that


Yup I checked on Jan 6 in the customer service group digital storm rep said they
Have plenty of 3080s



Lumos
i7-10900k
32gb ram
RTX 3080
500 gb NVME SSD
2 Tb 860 EVO
Back to Top
 Post Reply Post Reply

Forum Jump Forum Permissions View Drop Down



This page was generated in 4.589844E-02 seconds.