FAQ FAQ  Forum Search   Register Register  Login Login

Time Line

Post Date: 2019-10-06

 Post Reply Post Reply
Author
  Topic Search Topic Search  Topic Options Topic Options
fjc320 View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 12 Sep 2019
Online Status: Offline
Posts: 35
  Quote fjc320 Quote  Post ReplyReply bullet Topic: Time Line
    Posted: 06 Oct 2019 at 6:22pm
These are just average. Could be shorter or longer.

Remember "Wanting is a much stronger emotion than having" Oops

Stage 1: Pending Production (5-10 Business Days)
Your order has been placed into our backlog, our inventory department will begin to allocate the components necessary for your order and add it to our backlog. This stage usually takes the longest depending on how busy we are.

Stage 2: Inventory Assigned (2-5 Business Days)
A special component bin has been assigned for your order. We then locate components from our inventory and place them inside your component bin. If any components are out of stock, we are then waiting for them to be delivered to our storage center.

Stage 3: Initial Setup (1-3 Business Days)
The hardware components in your order are now placed into one of our specialized test benches for evaluation. The installation of the operating system, drivers and any applications that are specific to the system you ordered are completed here.

Stage 4: Final Assembly (4-8 Business Days)
One of our system builders will carefully put together your order as if it was their own, they have a passion to build every system as if it was their own and take great pride in the work they do.

Stage 5: Stress Testing (5-10 Business Days)
Our team is running a final batch of tests to verify the integrity and stability of your system. This allows us to ensure that every system we ship will be a rock-solid machine for years to come. We will also install benchmark utilities and testing software to correctly monitor your system's performance throughout our stress testing process.

Stage 6: Quality Assurance (3-5 Business Days)
Your system is undergoing a very detailed quality control analysis. We're inspecting your machine for missing screws, loose cards, checking for special requests, verifying the configuration, and double checking our stress-test results. Our inspectors are trained with an eye for detail and ensure that every system leaves our facility with the art of perfection.

Stage 7: Packaging (1-3 Business Days)
Our team is carefully preparing your order to be shipped. Things include wiping down the system, preparing packaging materials to ensure safe transit, and mounting the computer and all of your accessories into a box to be assigned a shipping label and shipped. Once it ships within the next 1-3 business days, you will get an email with a tracking number at the end of the day.

PS:

Good things come to those who wait
Persevere
Stick at it
Don’t give up
Keep going
It’s worth it in the end
Hold on
Hang on
Hang in there
Hold tight
Hold your horses
See how things go
Wait and see
Bear with me
All in good time!
Don’t be impatient
I’m looking forward to it/doing it
I can’t wait for it
I can’t wait to do it


Edited by fjc320 - 06 Oct 2019 at 6:24pm
Back to Top
 Post Reply Post Reply

Forum Jump Forum Permissions View Drop Down



This page was generated in 3.515625E-02 seconds.