FAQ FAQ  Forum Search   Register Register  Login Login

what to expect

Post Date: 2021-02-16

 Post Reply Post Reply
Author
  Topic Search Topic Search  Topic Options Topic Options
moose View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 16 Feb 2021
Online Status: Offline
Posts: 4
  Quote moose Quote  Post ReplyReply bullet Topic: what to expect
    Posted: 16 Feb 2021 at 12:39pm
Ordered Lumos With
i9 10900k
3080
z490 Plus

Just curious to see what kind of wait time I should be expecting.
The CPU seems to be readily available other places, as well as the motherboard so really just wondering how long the backlog is on the 3080.

Thanks.   
Back to Top
Slick_the_Bandit View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 20 Jan 2021
Online Status: Offline
Posts: 87
  Quote Slick_the_Bandit Quote  Post ReplyReply bullet Posted: 16 Feb 2021 at 1:47pm
Don’t know about 3080s at the moment, but I know that the average I’m reading on here is about 2-3 months for a PC to get shipped. I’m already about a month and a half in myself.
Stage 1: 1/8/21 | Stage 2: 2/23/21 | Stage 3: 2/25/21 | Stage 4: 2/26/2021 | Stage 5: 3/9/2021 | Stage 6: 3/9/2021 | Stage 7: 3/10/2021 | Shipped: 3/10/2021 | Arrived: 3/11/2021
Back to Top
moose View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 16 Feb 2021
Online Status: Offline
Posts: 4
  Quote moose Quote  Post ReplyReply bullet Posted: 16 Feb 2021 at 2:27pm
Originally posted by Slick_the_Bandit

Don’t know about 3080s at the moment, but I know that the average I’m reading on here is about 2-3 months for a PC to get shipped. I’m already about a month and a half in myself.
what parts did you order? read a lot of people waiting on AMD, but don't see much other info regarding 3080s.
Back to Top
Nomad1970 View Drop Down
Senior Member
Senior Member

Email address used to purchase matched with forums account email.

Joined: 23 Feb 2013
Online Status: Offline
Posts: 716
  Quote Nomad1970 Quote  Post ReplyReply bullet Posted: 16 Feb 2021 at 5:28pm
I just went to newegg and all of their RTX3080s are showing out of stock.
My Precious 2
I7-9700 oc 4.7GHz
32GB DDR4 3000MHz Corsair Vengeance RGB Pro
SSD M.2 (512GB Samsung 970 PRO)
SSD M.2 1TB Samsung 970 EVO
240GB Samsung 860 Pro SSD
1TB W.D. HD
EVGA GTX 1080Ti
Back to Top
Slick_the_Bandit View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 20 Jan 2021
Online Status: Offline
Posts: 87
  Quote Slick_the_Bandit Quote  Post ReplyReply bullet Posted: 17 Feb 2021 at 6:51am
Originally posted by moose

Originally posted by Slick_the_Bandit

Don’t know about 3080s at the moment, but I know that the average I’m reading on here is about 2-3 months for a PC to get shipped. I’m already about a month and a half in myself.
what parts did you order? read a lot of people waiting on AMD, but don't see much other info regarding 3080s.


I got a 5800X CPU, which is the least popular CPU option luckily. But it turns out parts really aren’t holding my build back. Got confirmation that my parts haven’t even been set aside yet. There isn’t an assessment on whether or not my build needs parts. I’m just waiting in a queue, as per customer service. So, getting closer to 2 months just waiting in line.

I was allegedly just put on a fast lane status, but no stage change yet. My confidence that they’ll reach the deadline they gave me isn’t strong. Hopefully I’m wrong.
Stage 1: 1/8/21 | Stage 2: 2/23/21 | Stage 3: 2/25/21 | Stage 4: 2/26/2021 | Stage 5: 3/9/2021 | Stage 6: 3/9/2021 | Stage 7: 3/10/2021 | Shipped: 3/10/2021 | Arrived: 3/11/2021
Back to Top
Bamareb28 View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 18 Dec 2020
Online Status: Offline
Posts: 61
  Quote Bamareb28 Quote  Post ReplyReply bullet Posted: 17 Feb 2021 at 7:58am
Same order basically and i waited just under 2 months.Worth it let me tell ya
Back to Top
Spartacii View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 13 Nov 2015
Online Status: Offline
Posts: 33
  Quote Spartacii Quote  Post ReplyReply bullet Posted: 19 Feb 2021 at 1:08pm
I ordered a 5900X/6800 XT combo and was on Stage 1 on 11/23 but have been on Stage 2 since 1/25.
:-(
Having said that, during the first month after I placed my order, I did take advantage of the build/shipping delay to re-configure and change my mind about coolers/RAM/hard drives more than once and DS was very patient with my indecision.
Now I'm just hoping to get my PC before the last week of March when I'm off work and can stay home and have plenty of time to play with it but that seems iffy to me.
Intel i7-12700K
Nvidia RTX 3090

AMD Ryzen 5900X
AMD Radeon 6800XT
Back to Top
moose View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 16 Feb 2021
Online Status: Offline
Posts: 4
  Quote moose Quote  Post ReplyReply bullet Posted: 13 Mar 2021 at 9:55am
Just an update!
Stage 1: 2/5
Stage 2: 2/24
Stage 3: 2/25
Stage 4/5/6/7/Shipped: 3/12
Back to Top
Slick_the_Bandit View Drop Down
Newbie
Newbie

Email address used to purchase matched with forums account email.

Joined: 20 Jan 2021
Online Status: Offline
Posts: 87
  Quote Slick_the_Bandit Quote  Post ReplyReply bullet Posted: 15 Mar 2021 at 7:52am
Congrats :)

I also received my PC!
Stage 1: 1/8/21 | Stage 2: 2/23/21 | Stage 3: 2/25/21 | Stage 4: 2/26/2021 | Stage 5: 3/9/2021 | Stage 6: 3/9/2021 | Stage 7: 3/10/2021 | Shipped: 3/10/2021 | Arrived: 3/11/2021
Back to Top
 Post Reply Post Reply

Forum Jump Forum Permissions View Drop Down



This page was generated in 0.8144531 seconds.